The new path underneath the Hurdman Transitway bridge

Visiting Hurdman bridge and the New Pathway

July 31, 2018 Hansonthebike 12

Reading Time: 5 minutesHurdman Transitway bridge reopened The Hurdman transitway bridge is open again for cycling and walking now the Transitway has been converted to LRT. The pedestrian and cycling space next to the tracks, separated by a high fence, is an important link over the Rideau River. It connects with the NCC eastern pathways, which connect to the Hospital Link I described earlier this month. It also connects with Lees Ave LRT station and Hurdman Station as well as to the western pathway along the Rideau River which is currently being developed.Not all is in place though but since I was in [Read more…]

A pedestrian and cycling bridge next to the current heritage bridge at Billings could make a huge difference for cyclist coming from the south end.

How About a 2nd Billings Bridge in Old Ottawa South?

July 24, 2018 Hansonthebike 5

Reading Time: 3 minutesA hotly debated area for safe cycling in Ottawa is the intersection at Riverside and the Billings Bridge, built in 1916. According to BikeOttawa’s website, the intersection at the south side is the one that has the most reported collisions in Ottawa, including a deadly one, when Meg Dussault was waiting on her bicycle at a cramped sidewalk/MUP and a right turning truck caught her bars. Vision Zero From a Sustainable Safety or Vision Zero point of view, this intersection needs to be changed, so that this can never happen again. There are plans to build a path underneath the [Read more…]

Thank you note on Harmer Ave bridge

Harmer Bridge Replacement: Lack of Clear Policy

July 17, 2018 Hansonthebike 2

Reading Time: 5 minutesFor 55 years, the Harmer bridge over the Queensway served walking and cycling citizens on both sides of the Queensway, but this month it will be closed and removed in order to build a new bridge. The old bridge over the Queensway will be removed overnight and the new one eventually put in place overnight. The replacement will take two years though, ‘because two new ramps need to be build’. (The 12 km LRT, partly underground, will take just under six years) No alternative to Harmer Bridge Unfortunately, there is no close safe alternative to cross the Queensway. The initial [Read more…]

New pathways Along Hospital Link in Altavista-Riverview

July 11, 2018 Hansonthebike 8

Reading Time: 6 minutesAlthough the Hospital Link is not completely finished yet, I decided to go out and take a look recently. The weather was finally a pleasant 20 degrees again, unlike the sweltering 34-36 Celsius (nearly 100F) last week. I had been doing some 20 km and 30 km bike tours with tourists in the heat, and although it is bearable when you are moving, the sun really hits you when you stop cycling. I cycled there first on my own; later in the weekend I went back with Heather Shearer after a meeting at city hall. We approached the link from [Read more…]

I Cycled with an Astronaut through Downtown Ottawa

July 8, 2018 Hansonthebike 2

Reading Time: 5 minutesUpdate January 21, 2121: the GG resigned after allegations of creating a toxic work environment. Wednesday June 27, I got a phone call from the office of the Governor General of Canada.: if I would like to join GG Julie Payette on a short bike ride on Canada Day. The Governor General is the official representative of Queen Elizabeth II in countries that recognize the Queen as Head of State. Which Canada does. The role of the GG is ceremonial and they are appointed every four years; sometimes a fifth year is added. Astronaut Payette The current Governor General is [Read more…]